Farrell Contracts were award the following works by Obelisk Power Systems at the Cappaghwhite B wind farm project:
• Design & build of a 38kv ESB spec sub station with control building and external electrical yard
• Cable trenching and installation works for 5Km of site wind farm cabling
Works took place on site between Sept 2017 and Feb 2018 with design works being completed before hand